• 0

Project Consultancy, Reports & Profiles

 

Himachal Pradesh is one of those states of India, which quickly grew to become from the country’s most backward States to one of the most progressive states. Presently, Himachal ranks fourth compared to the per capita profits among the Indian Union states. The rapid development of Himachal Pradesh has attracted many startups and entrepreneurs to start their businesses in the state. The nation has also attracted investments in the sectors, even in pharmaceutical, IT, and engineering industries. 

Because the Himachal dirt-free weather is extremely appropriate for the advent of electronic industries, many electronic complexes were established in the state. With 5 perennial rivers flowing through the nation, Himachal Pradesh has the potential to make contributions to 26% of India's hydroelectric ability. 

The state has a predicted hydroelectric ability of over 23,000 MW. The Baddi Barotiwala Nalagarh commercial belt developed as a key manufacturing center for startups and is predicted that the area is the largest drug manufacturing location in Asia. 

Himachal Pradesh is recognized for its scenic beauty and the advent of national tourism ought to grow through 5.90% of the CAGR. The authorities also advanced the adequate infrastructure for the development of tourism that includes a provision of public offerings, roads, communique networks, airports, shipping services, water supply, and civic offerings, amongst others.


Growing Key Sectors For Startups To Start Their Businesses: 

·         With satisfactory agro-climatic situations, Himachal Pradesh has generated the importance of industrial crops, inclusive of low seasonal greens, potatoes, and ginger. The agriculture sector is the main profession of the state and has inspired many entrepreneurs to start some of the most profitable agriculture businesses. To grow the manufacturing of meals grains, the emphasis has been set up on the distribution of excessive-overall performance range seeds to farmers. 

 

·         Apart from agriculture, one of the most thriving industries in Himachal Pradesh is the pharmaceutical industry. It has been noticed that the pharmaceutical industry of the state is one of the fastest-growing industries. The state government also encourages the industry to attract new startups within the state. In FY20, the exports of formulations of Himachal Pradesh and biological drug addicts had been placed at US $ 822.0 million and touched US $ 814.39 million in a monetary period of 12 months. 

 

·         Another booming sector for the state is the Tourism sector. The tourism industry of Himachal Pradesh brings a high profit to the business of the states. The sector alone contributes 7% of the total GDP. The internal visitor entrance inside the state reached 16.83 million in 2019, even as the number of overseas vacationers reached 383,000. 

 

·         Himachal Pradesh made sizable effects within the area of industrialization in recent years. The rich herbal sources of the state are correctly appropriate for investments in the primary sectors, along with the purchase of agricultural merchandise, hydroelectric energy, cement, and tourism. Himachal Pradesh made good sized effects in the area of industrialization in recent years. 

 

To provide support to the employers' infrastructure, the officials of Himachal Pradesh have advanced 41 commercial areas and 15 industrial estates. Solan, Sirmour, Kangra, and Una districts are on the top in terms of investments attracted. The Rohtang tunnel, which was recently inaugurated, for a 9.02 km period, passing through the Rohtang bypass, is the longest avenue tunnel in the world, linking Manali with the Lahaul Spiti valley. Making it easy for businesses to connect.

 

Entrepreneur India’s studies significantly cover Indian markets, contemporary analysis, outlook, and forecast. The market forecasts are evolved based totally on secondary studies and are converted through interactions with industry players. The team uses reliable facts and database resources and the information of these assets are processed by professionals and covered inside every project report. The project reports permit an entrepreneur to understand the profitability of the mission through revealing info as raw substances required, production manner, undertaking fees, and snapshots of other economic functions of the project.

AK_20Art21

 


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Lithium Ion Battery Recycling Detailed Project report on How to Start Battery Recycling Business
Lithium Ion Battery Recycling Detailed Project report on How to Start Battery Recycling Business

 

A lithium ion battery i... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Want to start a Calcium Propionate Manufacturing Business Calcium Propionate market is projected to register a CAGR of over three Percent
Want to start a Calcium Propionate Manufacturing Business Calcium Propionate market is projected to register a CAGR of over three Percent

Calcium propionate (also called calcium propanoate) is a chemical compound, whose sal... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
3-Chloropivaloyl Chloride Manufacturing Business Plan
3-Chloropivaloyl Chloride Manufacturing Business Plan

3-chloropivaloyl chloride i... Read More

Capacity :
3-Chloropivaloyl Chloride: 4 MT Per Day | Hydrochoric Acid (30%)- by product: 3 MT Per Day
Plant and Machinery cost:
252.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
686.00Lakhs
Add To Inquiry Basket
Start Quartz Slabs Manufacturing Business
Start Quartz Slabs Manufacturing Business

Quartz is the most plentifu... Read More

Capacity :
250 Nos. per day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
3200.00Lakhs
Add To Inquiry Basket
Project Profile on Sodium Hypochlorite Manufacturing
Project Profile on Sodium Hypochlorite Manufacturing

The active ingredient of ch... Read More

Capacity :
4500 MT Per Annum
Plant and Machinery cost:
55.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
214.00Lakhs
Add To Inquiry Basket
Rice Husk based Biodegradable Cutlery Making Plant
Rice Husk based Biodegradable Cutlery Making Plant

People around the world hav... Read More

Capacity :
Biodegradable Cutlery (Per Set 6 Pcs. Flatware): 1,852 Sets Per Day
Plant and Machinery cost:
28.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
222.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery LiFePO4 Production Business
Lithium Ion Battery LiFePO4 Production Business

A lithium-ion cell, sometim... Read More

Capacity :
Lithium Ion (LiFePO4) Battery Back of Power 4.8 KWH (No. of Cells 800) for Three Wheeler: 26 Nos/Day
Plant and Machinery cost:
289.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
970.00Lakhs
Add To Inquiry Basket
Ferric Pyrophosphate Production Business
Ferric Pyrophosphate Production Business

Ferric Pyrophosphate:

Read More

Capacity :
600 MT Per Annum
Plant and Machinery cost:
48.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
133.00Lakhs
Add To Inquiry Basket
Set Up Production Unit of ADHESIVE (Fevicol Type)
Set Up Production Unit of ADHESIVE (Fevicol Type)

Any substance that is appli... Read More

Capacity :
300 MT Per Annum
Plant and Machinery cost:
40.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
70.00Lakhs
Add To Inquiry Basket
Start Production Business of Tartaric Acid
Start Production Business of Tartaric Acid

 

You may be aware that tartaric acid is frequen... Read More

Capacity :
10 MT per day
Plant and Machinery cost:
400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
Production of Malic Acid Powder The Best Manufacturing Business Idea
Production of Malic Acid Powder The Best Manufacturing Business Idea

 

Malic Acid Powder:

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Ferric Pyrophosphate: Start your own Manufacturing Business
Ferric Pyrophosphate: Start your own Manufacturing Business

 

Introduction to Ferric Pyrophosphate: Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Flat Glass Manufacturing Business
Flat Glass Manufacturing Business

 

Glass has a microscopic structure similar to that of a liquid, where the various components come together to... Read More

Capacity :
4000 Sq.Mtrs. per day
Plant and Machinery cost:
14000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
30.00 %
TCI :
0.00 Lakhs
Cost of Project :
18700.00Lakhs
Add To Inquiry Basket
Start Production Business of Rubber Granules from Waste Tyre
Start Production Business of Rubber Granules from Waste Tyre

Rubber is a polymer of butadiene and one of the most significant chemical components. It is utilised extensively in a ... Read More

Capacity :
Rubber Granules 5 MT per Day By Product Steel Wire 0.5 MT per Day
Plant and Machinery cost:
6000000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
20700000.00Lakhs
Add To Inquiry Basket
Manufacturing of Aluminium Ingots from Aluminium Scrap
Manufacturing of Aluminium Ingots from Aluminium Scrap

Compared to blooms, billets, and slabs, aluminium ingots are very large casting products both in size and shape. Altho... Read More

Capacity :
Aluminium Alloy Ingots 12 MT per day Aluminium Scrap 0.20 MT per day
Plant and Machinery cost:
700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1100.00Lakhs
Add To Inquiry Basket
Nicotine Sulphate from Tobacco Leaves Production Business
Nicotine Sulphate from Tobacco Leaves Production Business

With human assistance, tobacco is grown, with the leaf being the most valuable component of the plant. Although tobacc... Read More

Capacity :
Nicotine Sulphate 3.6 MT per Day Waste Tobacco 28.3 MT per Day
Plant and Machinery cost:
16100000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
141600000.00Lakhs
Add To Inquiry Basket
Natural Tanning Powder  Production Business
Natural Tanning Powder Production Business

 

Comparatively speaking to other methods of tanning, natural tanning is now the most conventional, classic, a... Read More

Capacity :
600 MT per Annum
Plant and Machinery cost:
3700000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
27000000.00Lakhs
Add To Inquiry Basket
You Should Read SYour Own Industry in Booming Sectors
You Should Read SYour Own Industry in Booming Sectors

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Set Up Automated Vehicle Scrapping Unit
Set Up Automated Vehicle Scrapping Unit

 

Vehicle scrapping units, also called scrapyards, are now playing an important r... Read More

Capacity :
0
Plant and Machinery cost:
325.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
1455.00Lakhs
Add To Inquiry Basket
Manufacturing Business Plan For ZINC INGOTS
Manufacturing Business Plan For ZINC INGOTS

 

Zinc ingot is a white or gray color pure zinc metal, which is cast into a block... Read More

Capacity :
Zinc Ingots (Purity 98%) 6 MT Per Day
Plant and Machinery cost:
124.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
863.00Lakhs
Add To Inquiry Basket
PSA Oxygen Plant
PSA Oxygen Plant

 

PSA p... Read More

Capacity :
30 to 36 cylinders per day
Plant and Machinery cost:
45.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
PSA Oxygen Gas Plant
PSA Oxygen Gas Plant

PSA plants take... Read More

Capacity :
180 to 200 cylinders per day
Plant and Machinery cost:
99.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor

 

The double-edged ... Read More

Capacity :
Disposable Safety Razors: 864,000 Units per Day Razor Blade: 172,800 Units per Day Steel Scrap: 500
Plant and Machinery cost:
467.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.51%
Break Even Point (BEP):
43.43 %
TCI :
0.00 Lakhs
Cost of Project :
2285.00Lakhs
Add To Inquiry Basket
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings

 

Casting Read More

Capacity :
12 MT per Day
Plant and Machinery cost:
311.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.83%
Break Even Point (BEP):
55.20 %
TCI :
0.00 Lakhs
Cost of Project :
1135.00Lakhs
Add To Inquiry Basket
Business of Disposable Safety Razors
Business of Disposable Safety Razors

 

The double-edged ... Read More

Capacity :
Razor Blade for Safety Razors Pack of 5 pcs each: 57,600 Units per Day Steel Scrap: 500 Units per Da
Plant and Machinery cost:
393.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
57.75%
Break Even Point (BEP):
28.02 %
TCI :
0.00 Lakhs
Cost of Project :
815.00Lakhs
Add To Inquiry Basket
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings

Pipe fittings, also known a... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Extraction of Essential Oil from Lemon Grass
Extraction of Essential Oil from Lemon Grass

Oil of lemongrass is one of the most important essential Oils. Large quantities are used for the extraction of citr... Read More

Capacity :
Lemon Grass Oil (10 ml Size Pack) 1,334 Ltrs per Day
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.60%
Break Even Point (BEP):
69.69 %
TCI :
0.00 Lakhs
Cost of Project :
607.00Lakhs
Add To Inquiry Basket
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant

 

Bicarbonate Cartri... Read More

Capacity :
Bicarbonate Cartridge 720g 166.7 Nos. per day Bicarbonate Cartridge 650g 500.0 Nos. per day Acid Co
Plant and Machinery cost:
53.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.28%
Break Even Point (BEP):
35.25 %
TCI :
0.00 Lakhs
Cost of Project :
1153.00Lakhs
Add To Inquiry Basket
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit

 

Methylated spirits... Read More

Capacity :
Surgical Methylated Spirit 1 Ltr Size Bottle 4,000.0 Nos. Per Day Surgical Methylated Spirit 5 Ltr S
Plant and Machinery cost:
79.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.53%
Break Even Point (BEP):
54.72 %
TCI :
0.00 Lakhs
Cost of Project :
265.00Lakhs
Add To Inquiry Basket
2nd Revised Edition of The Complete Book on Printing Technology
2nd Revised Edition of The Complete Book on Printing Technology

 

2nd Revised Edition of The Complete Book on Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Ideas and Opportunities in Graphite Crucible
Business Ideas and Opportunities in Graphite Crucible

 

Business Ideas and Opportunities in Graphi... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Opportunities in Disposable Nitrile Gloves
Manufacturing Opportunities in Disposable Nitrile Gloves

Manufacturing Opportunities in Disposable Nitrile Gloves. The Most Profitable Industry to Lau... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of A4 and A3 Size Paper
Production of A4 and A3 Size Paper

 

Production of A4 and A3 Size Paper. Profitab... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Investment Opportunities L-ASCORBIC ACID (PLAIN)
Investment Opportunities L-ASCORBIC ACID (PLAIN)

 

Investment Opportunities L-ASCORBIC ACID (... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags from Corn Starch
Biodegradable Plastic Bags from Corn Starch

Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation charac... Read More

Capacity :
Biodegradable Plastic Bags (Per Bag 25 gms Size): 12 MT per day
Plant and Machinery cost:
1053.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1498.00Lakhs
Add To Inquiry Basket
Manufacturing of Dextrose Anhydrous, Sorbitol & Vitamin C. Investment Opportunities in Pharma Sector.
Manufacturing of Dextrose Anhydrous, Sorbitol & Vitamin C. Investment Opportunities in Pharma Sector.

Manufacturing of Dextrose Anhydrous, Sorbitol & Vitamin C. Investment Opportunities in Pharma Sector. Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
White Oats Processing
White Oats Processing

White Oats Processing. Profitable Business Opportunities in Oat Based Products. Oatme... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Vermicompost and Organic Manure
Manufacturing of Vermicompost and Organic Manure

Manufacturing of Vermicompost and Organic Manure. Profitable Investment in Organic Natural Plant Nutrient Indust... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Biomass Briquettes from Biowaste.
Manufacturing of Biomass Briquettes from Biowaste.

Manufacturing of Biomass Briquettes from Biowaste. Profitable Investment in Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Black Pepper Essential Oil
Manufacturing of Black Pepper Essential Oil

Manufacturing of Black Pepper Essential Oil. Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
3 Star Hotel with 2 Banquet Hall & Restaurant
3 Star Hotel with 2 Banquet Hall & Restaurant

A hotel is an establishment that provides Read More

Capacity :
Air conditioned Deluxe Rooms:32 Units per day Conference Hall, Meeting Rooms & Business Lounge:0.5
Plant and Machinery cost:
150.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
30.00 %
TCI :
0.00 Lakhs
Cost of Project :
1014.00Lakhs
Add To Inquiry Basket
Workshop for Motors of Low Voltage (Up-To 1000V) and Distribution Transformers (Maintenance, overhauls and repairs)
Workshop for Motors of Low Voltage (Up-To 1000V) and Distribution Transformers (Maintenance, overhauls and repairs)

Maintenance of electrical equipment and the maintenance function in general, are key subjects ... Read More

Capacity :
Repair & Maintenance Motors (100 KW):2 Units per day On Site Annual Maintenance Contract (AMC):0.8 U
Plant and Machinery cost:
22.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
76.00Lakhs
Add To Inquiry Basket
PVC Wires and Cables
PVC Wires and Cables

An electrical cable is an assembly of one or more wires running side by side or bundled, which is used to carry electr... Read More

Capacity :
PVC Coated Copper Wires (100 Mtrs Rolls):33,784 Nos. per annum PVC Coated Aluminium Wires (100 Mtrs
Plant and Machinery cost:
195.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
1568.00Lakhs
Add To Inquiry Basket
Start your own industry of Synthetic camphor Production.
Start your own industry of Synthetic camphor Production.

Start your own industry of Synthetic camphor Production. Profit-Making Project for En... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Profitable Surgical Face Mask Industry.
Start Profitable Surgical Face Mask Industry.

Start Profitable Surgical Face Mask Industry. Money Making Business Ideas in production of Me... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of  Disposable Personal Protective Equipment (PPE) Kit
Manufacturing of Disposable Personal Protective Equipment (PPE) Kit


The purpo... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Ayurvedic Herbal Hand Sanitizer
Ayurvedic Herbal Hand Sanitizer
Hand hygiene is the best tool in preventing opportunistic infections caused by different micro organisms and to achieve this, the use of hand sanitize... Read More
Capacity :
1
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Liquid Hand Wash
Liquid Hand Wash
Hands are primary mode of transmission of microbes and infections. Hand-washing is critical in food production, food service and also important in ... Read More
Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Activated Carbon from Bamboo
Activated Carbon from Bamboo

Activated carbon is a non-graphite form of carbon and is micro crystalline in nature. It is extensively used in variou... Read More

Capacity :
450 MT/Annum
Plant and Machinery cost:
159.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
377.00Lakhs
Add To Inquiry Basket
Craft Beer
Craft Beer

A microbrewery or craft brewery is a brewery that produces small amounts of beer (or sometimes root beer), typically m... Read More

Capacity :
Craft Beer (Cans & Bottles 650 ml Size) : 9230 Nos./Day
Plant and Machinery cost:
890.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
1628.00Lakhs
Add To Inquiry Basket
Potato Products
Potato Products

Potato Products. Potato Balls, Nuggets and French Fries Manufacturing Business. Profitable Bu... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Hosiery Cloth (Cotton Processing, Bleaching, Dyeing, Finishing of Cloth)
Hosiery Cloth (Cotton Processing, Bleaching, Dyeing, Finishing of Cloth)

Hosiery, also referred to as legwear, describes garments worn directly on the feet and legs. The term originated as th... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Acrylic Garments
Acrylic Garments

Acrylic fabric is made with plastic threads. The plastic threads are made of a manmade polymer fiber created from foss... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NC Thinner Manufacturing Business
NC Thinner Manufacturing Business

NC Thinner Manufacturing Business. Production of Nitro Cellulose (N.C.) Thinner Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Expanded Polystyrene Manufacturing Industry
Expanded Polystyrene Manufacturing Industry

Expanded Polystyrene Manufacturing Industry. Production of EPS

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Moringa Oleifera (Drumstick) Powder
Moringa Oleifera (Drumstick) Powder

Moringa is a drought tolerant, medium-sized, evergreen tree that prefers warm, frost-free climates to flourish. Its te... Read More

Capacity :
180,000 Kgs. per annum
Plant and Machinery cost:
61.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
307.00Lakhs
Add To Inquiry Basket
Fresh Dips
Fresh Dips

Fresh DIP is a creamy liquid that is served with food or used to prepare foods. Sauces add flavor and moisture to food... Read More

Capacity :
Fresh Dips 50 gms Size Pkts: 1,500,000 Pkts per annum Fresh Dips 20 gms Size Pkts: 3,750,000 Pkts
Plant and Machinery cost:
30.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
213.00Lakhs
Add To Inquiry Basket
Electric PCC Poles
Electric PCC Poles

Pre-Stressed Cement Concrete Poles (PCC Poles) are highly durable and strong. PCC Poles are fabricated from excellent ... Read More

Capacity :
Electric Pre-stressed Concrete Cement Poles: 24,000 Nos. per annum
Plant and Machinery cost:
284.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
487.00Lakhs
Add To Inquiry Basket
Helmet Manufacturing
Helmet Manufacturing

A motorcycle helmet is a type of helmet (protective headgear) used by motorcycle riders. The primary goal of a motorcy... Read More

Capacity :
1,200 Nos. per day
Plant and Machinery cost:
246.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
602.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
Cumin, Turmeric, Chilly &... 0 0.00 0.00
Start Production Of Wire ... Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum 30.00 1736.00
Auto Brake Pad and Auto... Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum 27.00 1422.00
Business Plan for Product... Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0 28.00 1619.00
A Business Plan for Ferri... Ferric Pyrophosphate 600 MT Per Annum 31.00 133.00
How to Start A Business o... 0 0.00 0.00
A Business Plan for Seawo... Standard Seaworthy Container Size: 20Ft 2,400 Nos. Per Annum 28.00 2040.00
Setup Extraction of Salt ... Iodized Salt: 30,000 MT per annum, Industrial Salt: 30,000 MT per annum 29.00 2776.00
A business Plan For Surgi... Surgical Sutures: 450,000 Boxes per annum 27.00 877.00
Starting up production of... Glycerol Monostearate: 900 MT Per Annum 29.00 320.00
Startup A Business of Dou... 0 0.00 0.00
Now Is The Time To Take C... 0 0.00 0.00
Start Production of Potat... Potato Chips: 150,000 Kgs Per Annum Kurkure Type Snacks: 150,000 Kgs Per Annum 30.00 121.00
Setup Cashew Nut Processi... Cashew Nut Processing: 4,794 Kgs Per Day 23.00 1100.00
Start a Business of Parti... Particle Board (Size 4ftx8ftx16 inch.): 150,000 Nos. Per Annum 30.00 1100.00
A Business Plan for Wood ... Wood Plastic Composite (WPC): 10 Million Sq.Ft. per annum 27.00 790.00
Start a Production Of Sod... Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl): 200,000 MT Per Annum 14.00 1265.00
12345678910...

Showing 121 - 180 of 2765 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR